Location: Home >>News >>Company News

      On line monitoring device for transmission line icing, technology is more dazzling in the ice and snow

      Author: Click:1009 Time:2022-10-19

      [Abstract] Someone said that if the cold in the north is a physical attack, the cold in the south is a magic damage.

      Some people say that if the cold in the north is a physical attack, the cold in the south is magic damage. Indeed, under the same temperature, the humidity and cold make people shiver. Not only that, but also the outdoor equipment is affected. In particular, the overhead transmission lines, iron towers, towers and other outdoor equipment of the power grid. Every year, Yunnan and Guizhou, northern Guangdong and Guangxi, and eastern China often suffer from multiple rounds of cold air attacks, continuous low temperature, snow and freezing weather, resulting in local power lines icing, or even tower tilt Serious power grid accidents such as wire breakage and large area power failure.

      My deep memory is about the huge ice and snow disaster around the New Year in 2008. Almost 20 provinces across the country were affected by the ice and snow disaster, among which the power grid was severely damaged, causing widespread blackouts and power rationing. Therefore, we can see that the low temperature, freezing rain, ice and snow weather is a major obstacle to the safe operation of the power grid.

      It is the requirement of modern smart grid to fully master the actual situation of grid icing by relying on high-tech. Dingxin Smart Technology DX-WPS100-FB transmission line icing online monitoring device can monitor power line towers, conductors, porcelain bottles and other power equipment in real time, help the power sector to achieve online observation of grid icing, and fully master the actual situation of grid icing.

      The device is composed of front-end camera, micro meteorological sensor, pull tilt sensor, solar panel, communication terminal and back-end monitoring platform. The column tension sensor is installed between the insulator string and the beam, which can monitor the line tension. At the same time, the front-end high-definition camera of the equipment can observe the line environment in real time, monitor the formation process of icing, and remind the operation and maintenance personnel by SMS, alarm prompt, mobile phone app reminder, etc.

      The operation and maintenance personnel can take necessary emergency preparedness measures for the iced lines according to the on-site environmental image video and meteorological numerical forecast sent back by the transmission line icing online monitoring device, combined with the line tower terrain information.




      Related recommendations

      The online monitoring, distributed fault location and cable online monitoring equipment for power transmission and distribution lines launched by SHENZHEN DINSEE SMART TECHNOLOGY CO.,LTD. has been widely used in Southern Power Grid and State Grid, and has achieved good results.

      Record No.: Yue ICP Bei 2022070794-1 | Website Map XML Map

      主站蜘蛛池模板: 久久久精品国产sm调教网站 | 亚洲精品tv久久久久久久久| 国产精品99久久精品| 自拍偷在线精品自拍偷| 国产亚洲午夜高清国产拍精品| 99久久精品费精品国产一区二区 | 国产成人精品免费大全| 国产精品嫩草影院AV| 中文成人无字幕乱码精品区 | 国产三级精品久久| 一区二区精品在线| 国产精品一区在线播放| 国产精品内射后入合集| 性欧洲精品videos| 亚洲精品无码成人片在线观看| 久久精品中文字幕第23页| 国产精品亚洲αv天堂无码| 久久夜色精品国产亚洲| 1024国产欧美日韩精品| 精品久久久久久无码中文字幕一区| 亚洲国产精品自在拍在线播放| 九色精品视频在线观看| 国产精品亚洲不卡一区二区三区| 亚洲精品免费视频| 久久精品国产亚洲沈樵| 久久精品成人免费看| 国产cosplay精品视频| 99re8这里有精品热视频免费| 精品黑人一区二区三区| 久久九九精品99国产精品| 婷婷五月深深久久精品| 久久精品亚洲日本波多野结衣| 少妇人妻偷人精品视频| 久久99精品久久久久久久不卡| 精品国产VA久久久久久久冰| 国产午夜精品无码| 2020国产精品| 青青青青久久精品国产| 国产福利电影一区二区三区,亚洲国模精品一区 | mm1313亚洲国产精品无码试看| 久久亚洲精品中文字幕三区|